Case Studies; Wellacre Academy – School Cabling
Project Challenge
Greenlight was asked to provide a number of network enhancements.
Solution
Greenlight was asked to provide a number of network enhancements at the Academy. One project involved the installation of a network point in one of the gymnasia to enable a wireless access point to be installed. Another project involved the relocation of network ports in the office within the 6th form building.
A Cat 6 LSOH data cable link was installed between a communications cabinet on the 1st floor, through a classroom and terminated at a single RJ45 module in the gym on the ground floor, with associated patching into a pre-existing patch panel. This had to be carried out a desk height.
New ports implemented in the 6th form to expand the poorly designed original infrastructure.
“Greenlight were quick, clean & cost effective that was all we asked.”
Polychronis B
Management